Home   Contact us   Sitemap spacer Ðóññêèé
Sakhalin Home
GO
Sakhalin-2 Online
Media Centre
current vacancies
Contracting with us
Sakhalin-2 Project Surplus On Offer
Erosion Control and Reinstatement

Top News
 
Reinstatement 2008: Online Dispatch No. 2

Welcome to the second dispatch in 2008 describing work on reinstatement along the onshore pipelines Right of Way (RoW).


Other News

 
Reinstatement 2008: Online Dispatch No.1

Welcome to the first dispatch in 2008 describing field work on temporary erosion control and permanent reinstatement along the onshore pipelines Right of Way (RoW).
Read more

Related Links
Background information
Sakhalin-2 in the media
IUCN
23 Apr 2010
Can scientists and oil consortium save endangered whales?
Read more
Pipelines International
01 Mar 2010
Constructing Sakhalin Island’s pipeline network
Read more
Upstream
06 Nov 2009
Sakhalin Energy uses "smart well"
Read more